SAMMC-North Campus Parking Structure

Location: San Antonio, TX
General Contractor: Clark/Hunt Joint Venture
Electrical Value: $3 Million

Summary: Serving as the Integrated Design-Bid-Builder (IDBB)—a project delivery method being utilized by the U.S. Army Corps of Engineers that allows the constructor to interface with the architect-of-record throughout design—is Clark/Hunt, A Joint Venture. Bergelectric is part of the Clark/Hunt team on the $62-million consolidated parking structure, which will be centrally located for accessibility to all SAMMC-N medical facilities.

In addition to responsibility for installation of all lighting and power on the six story structure, Bergelectric crews are providing connections to elevators and mechanical equipment, lighting protection and emergency generation. Berg’s in-house Building Information Modeling (BIM) has been particularly valuable in laying out the conduit system for the emergency call phones, security cameras, tel/data, fire alarm and an automated time/parking system for the 5,000-vehicle garage.