Summary: At Amylin, perhaps the most monumental biopharmaceutical undertaking to date, is the lighting, power and equipment connections for a 64,500-s.f. facility with an aggressive 15-month schedule, which involved installation of a new 3,000 Amp electrical-service and distribution system with a back-up 650KW generator. Several Berg departments played vital roles by:
Completing Title 24 calculations and certifications. Berg’s Preconstruction Department worked in conjunction with Philadelphia-based electrical engineer L2 Architect to offer support during the design phase;
Closely coordinating with the mechanical, plumbing and fire-sprinkler trades, Berg’s Detailing Department was able to make a seamless connection of Amylin equipment to the new HVAC central plant, mechanical and fire-suppression systems. |