Summary: Taking their cue from the surrounding homes and landscape, architects Mosher, Drew, Watson, Ferguson designed the new school around several major plazas, with a focus on the chapel and its distinctive campanile.
With general contractor Sundt Construction spearheading the project, Bergelectric was tapped to handle the electrical systems.
Berg has a history of working successfully with Sundt, and with the project's electrical engineer, ILA+Zammitt Engineering Group. This time around, they collabaroted to provide the school with site-loop system ductbanks for tel/data, future TV, intercom/P.A., synchronized clock, security, fire-alarm and EMCS systems along with power distribution. |