About Bergelectric Bergelectric Experience Bergelectric Resources Bergelectric Careers Bergelectric Green Initiatives Contact Bergelectric

By Division

Corporate Headquarters
5650 West Centinela
Los Angeles, CA 90045
Phone (310) 337-1377
Fax (310) 337-2663

info@bergelectric.com

 

Coyote Ridge Correctional Fac.

Location: Connell, WA
General Contractor: Hunt/Lydig Joint Venture
Electrical Value: $24 Million

Summary: Working hand-in-hand with MW Engineering — a firm that has helped to streamline the design process by serving as both electrical and mechanical engineer — Berg was responisble for the design and installation of all medium-voltage power and distribution, lighting, lighting controls and emergency systems.

Spread over 58 acres, Coyote Ridge’s size and remote location in Connell, Washington — about 100 miles southwest of Spokane — presented logistical challenges including manpower, material deliveries, travel time, housing and more. Berg’s Portland office tapped into Berg’s considerable expertise developed over the course of constructing seven high-profile correctional facilities throughout the northwest.

.

.

.