Summary: General contactor Hensel Phelps headed up Phase I, which included a new six-story tower and basement that connected to the main facility. The new building will house administration and expanded services for Kaweah Delta’s nationally-recognized cardiac program.
Berg’s design coordination department was heavily involved from the start of the project. Armed with the latest detailing software, Berg’s design coordination team was well-versed in the requirements of the ever-changing healthcare industry.
Along with fixtures, switchgear and generators, Berg installed all electrical and low-voltage systems designed by electrical engineer Mazzetti & Assoc. |