Summary: Under the guidance of general contractor McCarthy, Architect Dekker/Perich/Sabatini’s evidence-based design is coming to life. By incorporating the latest in healthcare innovations, the $100-million complex will provide a healing environment comprised of three separate buildings—a diagnostic and treatment facility, patient tower and central utility plant.
Bergelectric is responsible for installation of all electrical power distribution lighting and fire-alarm systems for the 300,000-s.f. complex. To keep the medical center fully operational in the event of a power outage, Berg is also installing an emergency generator, paralleling switchgear, pad-mounted medium-voltage switches and distribution transformers. “For the heart of the hospital’s communication system, our crews will prepare the rough-in for all low-voltage systems—security, nurse call and overhead paging—as well as the cable tray for tel-data distribution,” explained Bergelectric’s Project Manager. |