On Campus Football Stadium and Student Union Center

Bergelectric has teamed up with Turner Construction to build the new football stadium and student union building at the University of Mary Hardin-Baylor. Bergelectric is installing all aspects of the electrical installation on the 8,000-10,000 capacity stadium simultaneously with the student union building, which anchors the visitor’s side of the stadium.

The stadium and student union building were constructed near the center of the campus on University Drive, adjacent to the Frank and Sue Mayborn Campus Center.  By locating the complex near the Mayborn Center (which housed the university’s arena) and nearby intramural fields, the university has created a “student activity zone” surrounded by student residence halls and apartments.

The combined cost of the student union building and the football stadium was more than $50 million.

Size
10,000 Capacity

Electrical Construction Cost
$8.2 Million

Duration
February 2012 – September 2014

Delivery Method
Design-Bid-Build

Other Team Members
Turner Construction
Populous, Inc. Architects
ME Engineers

Berg Regional Office