Design Build Success On Downtown SD Campus

In a design build effort with Randall Lamb and Sundt Construction, Bergelectric delivered the San Diego City College Mathematics & Social Sciences Facility—the newest addition to the congested downtown college campus.  Berg’s preconstruction efforts at each design phase proved to be a key element in keeping the project within the owner’s budget and ahead of the construction schedule.  “This process was increadibly beneficial,” said Bergelectric’s project manager.  “Most questionable aspects of the project constructability were flushed out in the design phase which resulted in minimum conflicts for all involved.

This 80,500-square-foot building houses five floors of academic classrooms and laboratories for Mathematics, Social and Behavioral Sciences, History and Political Sciences, Black and Chicano Studies, and a Corporate Education Center.  Bergelectric installed all electrical systems and their National Technology Systems Division was responsible for installation the fire alarm, security, and tel-data on this facility as well.

Size
80,500-square feet

Electrical Construction Cost
$3.7 Million

Duration
November 2010 – July 2013

Delivery Method
Design Build

Technology Systems
Tel-Data
Fire Alarm
Security

Other Team Members
Sundt Construction
Roesling Nakamura Architects
Randall Lamb Engineering

Berg Regional Office
San Diego, CA