A State-of-the-Art Medical Center in New Mexico

Under the guidance of general contractor McCarthy, Architect Dekker/Perich/Sabatini’s evidence-based design is completed. By incorporating the latest in healthcare innovations, the $100-million complex provides a healing environment comprised of three separate buildings—a diagnostic and treatment facility, patient tower and central utility plant.

Bergelectric was responsible for the installation of all electrical power distribution lighting and fire-alarm systems for the 305,000-s.f. complex. To keep the medical center fully operational in the event of a power outage, Berg has also installed an emergency generator, paralleling switchgear, pad-mounted medium-voltage switches and distribution transformers. For the heart of the hospital’s communication system, Berg crews prepared the rough-in for all low-voltage systems—security, nurse call and overhead paging—as well as the cable tray for tel-data distribution.

Size
305,000 square feet

Electrical Construction Cost
$14.7 Million

Duration
February 2010 – August 2012

Delivery Method
Design-Bid-Build

Other Team Members
McCarthy Building Co.
Decker, Perich, Sabatini Architects
Bridgers and Paxton Consulting Engineers

Berg Regional Office
Denver

SIMILAR PROJECTS

back_btn

VIEW PROJECTS BY: