Skip to content

UC Davis Orchard Park Redevelopment Project

After partnering with general contractors CBG Building Company for Michaels Student Living, the project developer on the completion of the massive UC Davis The Green at West Village—the largest student housing project in North America—Bergelectric crews are back on the…

Read more

Hilton Garden Inn Downtown Austin

In a collaborative effort that successfully applied Bergelectric’s advanced approaches to design build construction—including identifying key value engineering opportunities, BIM partnership and cutting-edge prefabrication capabilities—Bergelectric, along with DPR Construction and other key trade partners, successfully completed the new Hilton Garden…

Read more

Loma Linda University Health Campus Transformation

After Senate Bill 1953 became law in 1994 requiring all hospitals in California meet certain seismic standards, the board at Loma Linda University Health (LLUH) initially planned to modify its existing hospital buildings. But retrofitting the three classic cloverleaf towers,…

Read more

Mingei International Museum

Bergelectric recently completed a major renovation on the Mingei International Museum—a non-profit public institution that collects, conserves, and exhibits folk art, craft, and design. The project was an effort to reconnect the museum’s art and architecture with its immediate context…

Read more

The Rady Shell at Jacobs Park

The Rady Shell at Jacobs Park features concentric, widening, oval rings as its canopy, a structure that reaches a height of 57 feet and a width of 92 feet at the front of the stage. A marriage of brilliant architectural…

Read more

Orlando International Airport Terminal C Phase 1

Bergelectric has been working under the direction of Hensel Phelps on South Terminal C Phase 1 since May of 2018. The 822,000-s.f. Airside Terminal for the Greater Orlando Aviation Authority (GOAA) will feature 15 gates with a flexible configuration that…

Read more

Check Out Our Latest Power Source Magazine

The latest addition of Bergelectric's Power Source Magazine is here. Click the link below to gain insight into many of our latest projects across the country along with a tribute to our Diamond (75th) Anniversary.

Read more

Block 162

Bergelectric, under the direction of Swinerton Builders, has successfully completed the Block 162 project—a 33-story Class A office/mixed-use high-rise addition to Denver’s downtown skyline. The 1.1 million-square foot glass tower includes state-of-the-art office space which can easily be adapted to…

Read more

Bergelectric Named Accredited Quality Contractor by ABC

CARLSBAD, California, November 19 - Bergelectric today announced that it has been named an Accredited Quality Contractor by Associated Builders and Contractors. Only 229 of the nation’s elite merit shop construction contractors earned the credential in 2020. Very often in…

Read more
Back To Top