Skip to content

The Rady Shell at Jacobs Park

The Rady Shell at Jacobs Park features concentric, widening, oval rings as its canopy, a structure that reaches a height of 57 feet and a width of 92 feet at the front of the stage. A marriage of brilliant architectural…

Read more

Orlando International Airport Terminal C Phase 1

Bergelectric has been working under the direction of Hensel Phelps on South Terminal C Phase 1 since May of 2018. The 822,000-s.f. Airside Terminal for the Greater Orlando Aviation Authority (GOAA) will feature 15 gates with a flexible configuration that…

Read more

Check Out Our Latest Power Source Magazine

The latest addition of Bergelectric's Power Source Magazine is here. Click the link below to gain insight into many of our latest projects across the country along with a tribute to our Diamond (75th) Anniversary.

Read more

Block 162

Bergelectric, under the direction of Swinerton Builders, has successfully completed the Block 162 project—a 33-story Class A office/mixed-use high-rise addition to Denver’s downtown skyline. The 1.1 million-square foot glass tower includes state-of-the-art office space which can easily be adapted to…

Read more
Back To Top