![project-header-clear](https://www.bergelectric.com/wp-content/uploads/2021/04/project-header-clear.png)
Location
Camp Pendleton, CA
Size
58 miles
Electrical Construction Cost
$125 Million
General Contractor
RQ Construction
Delivery Method
Design Build
Marine Corps Advances With Utility Upgrades
The RQ-Bergelectric Joint Venture, operating as an integral part of the URS GMAC Team, completed this $125-million project that involved installation of 58 miles of underground communication infrastructure. Pinpoint accuracy was achieved through the use of ground-penetrating radar to scan every inch of proposed trench locations for conflicts with existing utilities; GPS location positions was included on all as-built drawings.
![](https://www.bergelectric.com/wp-content/uploads/2021/04/camp-pendleton-utlity-bergelectric_additional_scrolling_1220.jpg)
![](https://www.bergelectric.com/wp-content/uploads/2021/04/camp-pendleton-utlity-men-2-bergelectric_additional_scrolling_1220.jpg)
![](https://www.bergelectric.com/wp-content/uploads/2021/04/camp-pendleton-utlity-men-bergelectric_additional_scrolling_1220.jpg)
MILITARY
Similar Projects
Camp Pendleton, CA
Omaha, NE
Camp Pendleton, CA