Location
Woodlands, CA
Size
2.5MW
Electrical Construction Cost
$1.8 Million
General Contractor
Performance Contracting, Inc.
Delivery Method
Design Build
Achieving Energy Efficiency for Woodland City
Bergelectric installed solar arrays at six locations throughout the City of Woodland (Yolo County, CA). The arrays will provide a total of 2.5-megawatts to six City facilities including; the Water Pollution Control Facility, the Community and Senior Center, the Police Station, the Municipal Service Center, the Woodland Public Library, and City Hall. The six separate systems will include carports, rooftops, a solar shade canopy, and ground-mountsolar.