Location
Sacramento, CA
Size
95,000 sq. ft.
Electrical Construction Cost
$8.9 Million
General Contractor
Sundt Construction
Delivery Method
Design-Build
Using Project Innovation to Inspire Innovation
CSU Sacramento Ernest E. Tschannen Science Complex project
is a new 95,000 square foot multi-story Science Laboratory building. This design assist project posed unique electrical challenges that have been overcome by Preconstruction design involvement, BIM Modeling, prefabricated lab assemblies, field, and office support.
is a new 95,000 square foot multi-story Science Laboratory building. This design assist project posed unique electrical challenges that have been overcome by Preconstruction design involvement, BIM Modeling, prefabricated lab assemblies, field, and office support.
![](https://www.bergelectric.com/wp-content/uploads/2021/05/sacramento_state_science_II_facility_stairway_bergelectric_additional_scrolling_1220.jpg)
![](https://www.bergelectric.com/wp-content/uploads/2021/05/sacramento_state_science_II_facility_lab_bergelectric_additional_scrolling_1220.jpg)
![](https://www.bergelectric.com/wp-content/uploads/2021/05/sacramento_state_science_II_facility_dome_bergelectric_additional_scrolling_1220.jpg)
![](https://www.bergelectric.com/wp-content/uploads/2021/05/sacramento_state_science_II_facility_theater_bergelectric_additional_scrolling_1220.jpg)
![](https://www.bergelectric.com/wp-content/uploads/2021/05/sacramento_state_science_II_facility_front_bergelectric_side604.jpg)
![](https://www.bergelectric.com/wp-content/uploads/2021/05/sacramento_state_science_II_facility_sign_bergelectric_side_604.jpg)
HIGHER EDUCATION
Similar Projects
Riverside, CA
Sacramento, CA
San Diego, CA