![project-header-clear](https://www.bergelectric.com/wp-content/uploads/2021/04/project-header-clear.png)
Location
Riverside, CA
Size
180,000 sq. ft.
Electrical Construction Cost
$17.4 Million
General Contractor
Hensel Phelps
Delivery Method
Design Build
Design Build Research Facility
Multidisciplinary Research Building 1 (MRB1) now provides wet and dry research laboratories, core laboratory support facilities, a vivarium, and flexible space for faculty and academic support and collaboration at UC Riverside. The budget was based on a LEED Silver certification, but through partnering and innovation of the Design Build Team, the project achieved a LEED Platinum certification, which is the first on the University of California Riverside campus.
![](https://www.bergelectric.com/wp-content/uploads/2021/04/ucr-mrb-bergelectric_additional_scrolling_1220.jpg)
![](https://www.bergelectric.com/wp-content/uploads/2021/04/ucr-mrb-inside-bergelectric_additional_scrolling_1220.jpg)
![](https://www.bergelectric.com/wp-content/uploads/2021/04/ucr-mrb-inside-lounge-bergelectric_additional_scrolling_1220.jpg)
LIFE SCIENCE
Similar Projects
Riverside, CA
San Diego, CA
San Diego, CA