Location
San Diego, CA
Size
230,000 sq. ft.
Electrical Construction Cost
$6.8 Million
General Contractor
DPR Construction
Delivery Method
Design Build
Laboratory and Office Expansion
Renovations included updating an existing 44,000-sq-ft facility, adding a four-story, 90,000-sq-ft structure with labs and office space and building a 700-space parking structure. The campus now holds more than 150,000 sq ft of labs and 80,000 sq ft of offices and amenity space to promote collaboration.
![](https://www.bergelectric.com/wp-content/uploads/2021/04/biolegend-bergelectric_additional_scrolling_1220.jpg)
![](https://www.bergelectric.com/wp-content/uploads/2021/04/biolegend-dusk-bergelectric_additional_scrolling_1220.jpg)
![](https://www.bergelectric.com/wp-content/uploads/2021/04/biolegend-inside-bergelectric_additional_scrolling_1220.jpg)
![](https://www.bergelectric.com/wp-content/uploads/2021/04/biolegend-sidewalk-bergelectric_additional_scrolling_1220.jpg)
LIFE SCIENCE
Similar Projects
Riverside, CA
San Diego, CA
San Diego, CA