Location
San Diego, CA
Size
150,000 sq. ft.
Electrical Construction Cost
$3.1 Million
General Contractor
McCarthy Building Co.
Delivery Method
Design Assist
The Most Progressive Cardiac Facility in SoCal
Bergelectric helped turn an old Cox Communication office building info a state-of-the-art laboratory and office building. Bergelectric provided Sharp with a new primary electrical service upgrade that was tied into existing generators. New lighting fixtures, power distribution, and laboratory assemblies were installed by Bergelectric to provide sharp with a complete laboratory conversion.